Tuesday, November 19, 2013: M/s ELCINA Electronics Manufacturing Cluster Private Limited (EEMCPL) has proposed setting up an Electronic Manufacturing Cluster (EMC) in Bhiwadi, Rajasthan in an area of 100.7 acres of land and has been accorded in-principle approval by DeitY. Details of this Greenfield EMC are as under:
Location: The proposed electronic cluster is situated in IA Salarpur, (Khushkera Extn.), Bhiwadi, Alwar District in a 100.7 acre plot of land. The Industrial Area is situated on NH 8.
Road Connectivity: Located on National Highway 8 between Its distances from Major cities are about 40 Km from Gurgaon, 90 Km from Alwar, 175 km from Jaipur and 60 Kms from Delhi.
Airport Connectivity: Nearest Airport is IGI New Delhi at 25 Kms
Power Availability: 2 Feeder power lines are passing from the close proximity of the Cluster site besides two sub- station of 220KV and 132 KV are also near the cluster site. ELCINA is contemplating setting up a captive power plant with power backup of 30% of estimated power demand in the proposed electronic cluster.
Water Availability: The total water demand is estimated at 2.3 MLD. The water supply to the Electronic Cluster will be through a Ground Level Service Reservoir, Pumping Station, Elevated Level Service Reservoir (ELSR) and a Distribution System.
Environmental clearance: The applicant will be submitting Technical Environmental Impact Assessment (EIA) report about the proposed cluster in accordance to the Guidance manual for Industrial Estates along with the final DPR.
Proposed Project for which assistance sought: EEMCPL the SPV of the project, plans to establish and develop Basic Infrastructure Network, Utility Plants, Common Facilities, Social Welfare Facilities, etc., over an area of 527.08 acres at an estimated project cost of Rs 100.48 Crores.
Anchor clients/Interested parties: The Cluster would also endeavour to bring the entire gamut of electronic manufacturing operations under one umbrella and facilitate all stages of the value chain of electronic manufacturing. 19 members of the SPV have already been identified, who have contributed Rs. 9.09 Crore.
About the promoter: The Project is proposed by ELCINA (Electronic Industries Association of India), an Association of electronic component manufacturers; incorporated under the Companies Act 1956 in Delhi. The promoters have incorporated a Special Purpose Vehicle in the name of “ELCINA” Electronics Manufacturing Cluster Private Limited”
(EEMC) on Nov 21, 2012, a company incorporated under the Companies Act, 1956 (“SPV”) for the purpose of
establishing the Project.
Details of In-principle Approval: The in- principle approval for setting up a Greenfield EMC at Bhiwadi, in Rajasthan has been accorded to M/s EEMCPL on September 17, 2013 for development of common/ basic infrastructure facilities at an estimated cost of Rs 100.48 Crores.
Contact Details: Shri. Rajoo Goel, Secretary General, ELCINA , ELCINA Electronic Industries Association of India, ELCINA House, 422, Okhla Industrial Estate Phase III, New Delhi 110020; Phone : 91-11-41615985, 26924597,26928053; Email: [email protected]